A20 · Video
A20 in use
A real floor-standing unit being used to dispense water. This is a visual demonstration, not a measured production test.
2:16 · Mandarin · archive footage
Open videoAquaAloha resource library
Product videos, real equipment views, operating references and commercial technical sheets, all in one place.
19 resources
A20 · Video
A real floor-standing unit being used to dispense water. This is a visual demonstration, not a measured production test.
2:16 · Mandarin · archive footage
Open videoA10 · Video
The original A10 overview, including illustrated internal components. Rated output requires suitable temperature and humidity.
2:38 · English subtitles · promotional archive
Open videoA10 · Video
An exploded-view animation of the air path, cooling assembly, water tank and filter arrangement.
0:26 · component animation
Open videoA10 · Video
A close look at the actual controls, water filters and removable collection tank.
0:47 · manufacturer demonstration
Open videoA10 · Video
Product access, filter handling, the drip tray and water dispensing. Follow the matching manual for service procedures.
0:48 · manufacturer demonstration
Open videoA10 · Video
A look at the A10 assembly line, equipment checks and packing process from the supplied product archive.
0:49 · manufacturer archive
Open videoA20 · Video
Opening the A20 compartment, removing and refitting a cartridge. Disconnect power and follow the instructions matching your unit.
0:19 · English subtitles · supplied demonstration
Open videoA10 · Video
A close view of the three cartridges and blue pleated air filter. Confirm the cartridge and connector revision before service.
0:11 · supplied demonstration
Open videoCommercial · Video
A look at the assembly floor and equipment in production. Archive footage does not establish current inventory or individual unit testing.
0:19 · supplied assembly footage
Open video
Manual · PDFA10 · Manual
Complete supplied operating reference with an AquaAloha cover. Setup, controls, filter replacement and troubleshooting; match the revision to your nameplate.
English · PDF · 21 pages · 115V / 60Hz reference
Open / download
Manual · PDFA20 · Manual
Placement, first use, shutdown and maintenance from the earlier A20-B UF reference. The RO version has a separate cartridge schedule; match the actual unit.
English · PDF · 2 pages · UF owner summary
Open / download
Technical sheet · PDFA10 / A20 · Technical sheet
Capacity, footprint, power and the separate A20 RO / earlier UF filtration references. Storage and dimensional differences are identified for confirmation.
English · PDF · household configuration comparison
Open / download
Technical sheet · PDFA100 · Technical sheet
100 L/day reference at 30°C / 80% RH, 60 L storage, dimensions, power and configuration review.
English · PDF · 1 page
Open / download
Technical sheet · PDFCommercial · Technical sheet
Earlier silver-cabinet capacity, power, dimensions and storage references. Values differ from the supplemental blue-cabinet range; match the selected configuration.
English · PDF · 2 pages · earlier configuration
Open / download
Technical sheet · PDFA20 / A80 / A250 / A500 / A1000 / A2000 / A5000 / Commercial · Technical sheet
Blue-cabinet industrial outputs at three climate conditions, input power, energy, dimensions, net weight and electrical options, plus A80 and floor-standing 20L references.
English · PDF · supplemental brochure configurations
Open / download
Technical sheet · PDFA20 Desktop / A50 DC / A20000 / Commercial · Technical sheet
Vehicle layouts, staff card-access dispensing, solar integration, A5000 engineering views and three development concepts. Missing engineering values remain unconfirmed.
English · PDF · supplied drawings and concept images
Open / download
Technical sheet · PDFA3000 · Technical sheet
3000 L/day proposal, 480V / 60Hz power, 2000 L storage, airflow, vending review and the supplied engineering drawing.
English · PDF · 3 pages · elevation drawing
Open / download
Manual · PDFA10 / A20 / Filters · Manual
A10 PAC, UF and CB every 6 months; A20 RO PPF, GAC and T33 every 6 months, RO and BIO every 12 months. The earlier UF configuration is identified separately.
English · PDF · A10 / A20 RO / earlier A20-B UF
Open / download
Technical sheet · PDFA10 / A20 / Filters · Technical sheet
Set contents, matching packing dimensions, A10 weight and estimated A20 weight. Outer-carton data is confirmed for the shipment.
English · PDF · full-set packing reference
Open / downloadEquipment photographs & illustrations
Open a photograph to inspect the controls, filters and equipment layout.
Front, side, rear and filter-compartment photographs from the product archive.
Supplied AquaAloha unit and packing photographs, alongside component references.
Owner experiences
Already using an AquaAloha? Share your model, general location, experience and photos through our contact form. Let us know whether you would like us to feature your story; we will confirm permission before publishing it.